Beverage Grade Distillery #2 Installation 2022

Project Summary

  • Client Shoalhaven Starches
  • Location Bomaderry, NSW
  • Distance of Piping Installed 9km (process, steam, fire water)
  • Structural Steel Installed 420t
  • Mechanical Equipment Installed 1000t
Client

Shoalhaven Starches

Incidents
Defects
Location

Bomaderry, NSW

Manildra Group process over 1 million metric tonnes of wheat per annum. The Bomaderry location is a dynamic site, set between Bolong Road and the banks of the Shoalhaven River. The Beverage Grade Distillery project was installed within the operating Ethanol Plant requiring all works to be complete without hot work onsite.

Illawarra Engineering Services (“IES”) was contracted to provide and manage a team of engineers, supervisors and trades to carry out the part supply, fabrication, and installation of structural, the installation of client supplied structural steel, mechanical, and process piping fabrication / installation. IES‘s ability to understand the scope of work, to work independently and find solutions to technical quires was a key factor in delivering a quality product for our client

Project Summary

  • Client Shoalhaven Starches
  • Location Bomaderry, NSW
  • Distance of Piping Installed 9km (process, steam, fire water)
  • Structural Steel Installed 420t