Manildra Group process over 1 million metric tonnes of wheat per annum. The Bomaderry location is a dynamic site, set between Bolong Road and the banks of the Shoalhaven River. The Syrup MVR Evaporator Plant Installation project was on the Eastern end of the plant between the Ethanol Plant & Dairy Farmers.
Illawarra Engineering Services (“IES”) was contracted to provide and manage a team of engineers, supervisors and trades to carry out the supply, fabrication, and installation of structural, mechanical, and process piping installation. IES‘s ability to understand the scope of work, to work independently and find solutions to technical quires was a key factor in delivering a quality product for our client