The Wilpinjong coal handling and preparation plant (CHPP) Expansion project featured a collaborative delivery approach between Peabody and Ausenco Taggart. The scope of work of the expansion Included: a secondary ROM system featuring a 400 Tonne ROM bin, feeder breaker, scalping screen, secondary and tertiary stacker to deliver raw coal to a stockpile dedicated to the CPP. The total project value was $65,038,889.00 and the expansion is expected to increase seaborne production from the Wilpinjong Mine by 2 million to 3 million tons annually.