IES was engaged by Downer BMD JV to deliver the SMP scope for the WAS Thickening and Dewatering Package as part of the West Camden Water Recycling Plant (WRP) Upgrade and Amplification Stage 3. Our works include the supply, fabrication and installation of structural steel supports and mechanical piping across the WAS, TS and DS systems. This includes new pipework, valves, fittings, pipe supports and all associated connections, testing and commissioning. Operating within a live treatment facility, IES is responsible for managing critical shutdowns, confined space entries and complex interfaces while maintaining compliance with Sydney Water standards.